Vienna Water Supply Line
Location
Vienna Water Supply Line , Vienna
Austria
Water Tunnel monitoring
Crack opening/shearing monitoring
Long-term measurement
Remote measurements
Système:
System SOFO
Domain:
Domain Tunnels
Clients:
Vienna Water Supply
Start Year:
1999
End Year:
0
Installation:
Riss
Short Description:
The second Vienna water supply line was built in 1900. The tunnels are mad of concrete with a diameter of more than 2 m and a total length of about 170 km. A number of cracks have appeared in the some sections a long time ago and have been sealed with an appropriate treatment.
Aims of monitoring:
The evolution of the opening and shear movement of some of the cracks should be monitored over the years and during the filling and emptying of the pipe. The data is used to plan additional repair interventions.
Number of sensors:
6 Main results:
The measurements show that the cracks tend to open slowly as the time passes. This small tendency overlaps with the larger deformations due to the filling of the pipe. Shearing effects are also observed.
Installing senosrs in grooves
Finished work
Measruement results
Tunnel access point
Sensor layout
Related Papers:
-
Fibre Optic Methods for Structural Health Monitoring, Branko Glisic and Daniele Inaudi, , Johh Wiley & Sons, Ltd , (2007)
-
Finite Element Structural Monitoring Concept, Glisic B., Inaudi D., The 2nd fib International Congress June 5-8, 2006, Naples, Italy , (2006), on conference CD, ID 17-18