Lully
Location
Lully , Fribourg Canton
Switzerland
See map: Google Maps
Steel-concrete composite structure
Concrete monitoring during setting
Prestressing monitoring
Système:
System SOFO
Domain:
Domain Bridges
Clients:
Fribourg Canton
Start Year:
1996
End Year:
1998
Installation:
ICOM/IMAC-EPFL
Short Description:
The Lully highway bridge is an innovative composite bridge. The two independent concrete slabs are supported by a space steel truss. The concrete slab is prestressed in both directions. Setting retardant were added to the concrete mix.
Aims of monitoring:
Eleven 1 m long SOFO sensors were installed in the concrete slab to monitor its shrinkage, its interaction with the steel truss and the deformations due to prestressing.
Number of sensors:
11 Main results:
The figure shows the deformations measured by the SOFO sensors during the first 10 days after concreting. In the first phase the concrete shortens due to a temperature sinking during the night after concrete pour. The slab than expands due to the exothermic setting reaction. After reaching a temperature maximum, cooling starts and the slab becomes shorter. Three days after concreting, the slab is prestressed, the resulting slab deformation is clearly measurable and it was possible to verify the amount of prestressing effectively given to the slab. After this operation, the hydraulic shrinkage continues. The concrete pour of the next construction phase does non introduce a significant deformation in the slab.
Bridge during construciton
Deformations measured during the first month after concrete pouring
Related Papers:
-
Fiber optic deformation sensors for bridges monitoring, D. Inaudi, N. Casanova, S. Vurpillot, Int. Conf. on New Technologies in Structural Engineering, Lisboa, Portugal , (1997), p 975-982
-
Bridge monitoring by interferometric deformation sensors, D. Inaudi, S. Vurpillot, N. Casanova, Conference on Laser Optoelectronics and Microphotonics: Fiber Optic Sensors, Beijing, invited paper, SPIE , (1996), Vol 2895, p 34-45