9 Geschosse Wohngebaeude Ueberwachung


Emplacement

9 Geschosse Wohngebaeude Ueberwachung, Sisseln
Switzerland

Real-time monitoring during construction
Wall deformation during pouring

Système: 
System Other
Domaine: 
Domain Buildings
Clients: 
gb&t Gebäudebestand & Technik GmbH
Début des travaux: 
2009
Fin des travaux: 
2009
Installation: 
Smartec
Courte description: 
9 levels apartments building
Objectifs de contrôle: 
The building war renewed and consolidated
Nombre de capteurs: 
1
Résultats: 
The real-time measurement were taken continousely every 5 seconds during pouring of concrete (~45 min) and during the following 90 minutes. The measuring system was supposed to trigger a pre-warning in case of a wall deformation of 2mm and a warning in case of a 2.5mm deformations.
9 levels building
Monitored wall with sensor installation set-up
Sensor detail