9 Geschosse Wohngebaeude Ueberwachung
Emplacement
9 Geschosse Wohngebaeude Ueberwachung, Sisseln
Switzerland
Voir carte:Google Maps
Real-time monitoring during construction
Wall deformation during pouring
Système:
System Other
Domaine:
Domain Buildings
Clients:
gb&t Gebäudebestand & Technik GmbH
Début des travaux:
2009
Fin des travaux:
2009
Installation:
Smartec
Courte description:
9 levels apartments building
Objectifs de contrôle:
The building war renewed and consolidated
Nombre de capteurs:
1 Résultats:
The real-time measurement were taken continousely every 5 seconds during pouring of concrete (~45 min) and during the following 90 minutes. The measuring system was supposed to trigger a pre-warning in case of a wall deformation of 2mm and a warning in case of a 2.5mm deformations.
9 levels building
Monitored wall with sensor installation set-up
Sensor detail