Infraspeed Slab Movements


Emplacement

Infraspeed Slab Movements,
Netherlands

High speed railway monitoring
2D relative displacements monitoring of concrete slabs

Système: 
System MuST
Domaine: 
Domain Geotechnical
Clients: 
Inventec b.v.
Début des travaux: 
2006
Fin des travaux: 
2007
Installation: 
Inventec b.v.
Courte description: 
Highspeed railway tracks are installed on ~6m long concrete slabs. The sensors are installed on the joints between two slabs.
Objectifs de contrôle: 
The main aim of the project is to monitor relative movement between concrete railway slabs. Measurement in the lateral and vertical directions are periodically performed with a required accuracy in both directions of 0.05 mm.
Nombre de capteurs: 
134
View of the railway
MuST 2D Crack sensor installed on a joint between two slabs