Onnens Motorway A5
Emplacement
Onnens Motorway A5, Vaud Canton
Switzerland
Voir carte:Google Maps
Cut and cover tunnel
Concrete monitoring
Système:
System SOFO
Domaine:
Domain Tunnels
Clients:
Vaud Canton
Début des travaux:
2000
Fin des travaux:
2003
Installation:
De Cerenville Géotechnique,Smartec
Courte description:
The cross-section of the tunnel consists of two concrete vaults. The length of the tunnel is 1230 m.
Objectifs de contrôle:
The aim of the monitoring was to increase knowledge on the vaults behaviour during the outer filling loads application. 30 sensors were installed on one characteristic section. Fiber optic sensors are integrated in the global concept together with inclinometers, thermometers, load cells, piezometer cells and geometric measurement.
Nombre de capteurs:
6 Résultats:
Behaviour and stabilization of the cut and cover tunnel has been verified at each phases of the filling.
Global view
Fiber optic sensor and inclinometer in the central section
Connection box integrated in the framework
Final connection box after the removal of the framework on a technical gallery
